Projects - Overhaul of Vung Ang thermal power plant in 2018

Overhaul of Vung Ang thermal power plant in 2018


Project Description

Provision of replacement and spare materials and equipment for Vung Ang thermal power plant 1. Design and installation of dust blowing system for the 3rd floor of SCR system for both units in Vung Ang Thermal Power Plant

PROJECT LOCATION:

Ky Loi Commune, Ky Anh District, Ha Tinh Province

PROJECT TYPE:

Overhaul, maintenance and supply of equipment

PROJECT COST:

$3,600,000

CLIENT:

PV Power

GENERAL PROGRESS
99%
Installing dust blowing system
100%
Provide equipment for C&I system
100%
Supply of coal crusher system equipment
90%
Supply of Cooling water system
100%
Supply of Turbine BOP
100%
Supply of Driver Pump and Control valve for driver pump
100%