Projects - Overhaul of Pha Lai thermal power plant in 2011

Project Description

Provision of replacement and spare materials and equipment for  Pha Lai Thermal Power Plant Line 2.

PROJECT LOCATION:

Pha Lai Wards, Chi Linh Town, Hai Duong Province.

PROJECT TYPE:

Overhaul, maintenance and supply of equipment

PROJECT COST:

$2,312,900

CLIENT:

Vietnam Power Group - EVN

GENERAL PROGRESS
100%
Provide regular repair materials for system No.2
100%
Supply of thermal equipment and materials
100%
Supplying materials for overhaul of auxiliary equipment of turbine No. 6
100%
Supply of materials and equipment for the overhaul of the circulating water No. 6
100%
Supply of Turbine BOP
100%
Supply of Driver Pump and Control valve for driver pump
100%